Skip to main content

Complete Bathroom Demo and Remodel

October 6, 2024

Complete Bathroom Demo and Remodel

Hammertime Construction has reaffirmed their expertise and efficiency with the swift completion of a bathroom remodel in Millington, MD. The project was finished in a mere seven days, exemplifying their commitment to delivering high-quality work promptly. Initially, the customer reported several loose tiles. Upon removal, a leaking shower and subsequent rot in the framing behind the tiles were discovered. The team repaired the framing, installed a cement backer board, and waterproofed the area. An acrylic tub and wall surround were chosen for their low maintenance and resistance to mildew and mold. Moen fixtures, a Kohler toilet, and a new pedestal sink were installed. Luxury Vinyl plank flooring and PVC baseboard were used for durability, and a pocket door was added to the pantry to conserve space. Another complete bathroom remodeling.

Project Image Gallery

Products Used

Moen, Kholer, Acrylic, Delta, LVP

Request A Consultation Today With The #1 Annapolis Remodeling Contractor